国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標(biāo)簽

當(dāng)前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-08-15 08:53來源:藍(lán)天飛行翻譯 作者:admin
曝光臺 注意防騙 網(wǎng)曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費(fèi)者

be checked before inertial systems are aligned and the position should be recorded in the flight log and/or
Master Document. It is recommended that subsequent 'silent' checks of the present position and of the
inertial velocity outputs (e.g. ground speed registering zero) be carried out independently by both pilots
during (an early stage of) the pre-flight checks and again just before the aircraft is moved. Any discrepancies
should be investigated.
8.3.2 With regard to the insertion of the initial co-ordinates whilst on the ramp, the following
points should be taken into account:
in some inertial systems, insertion errors exceeding about one degree of latitude will
illuminate a malfunction light. It should be noted that very few systems provide protection
against longitude insertion errors.
at all times, but particularly in the vicinity of the Zero Degree E/W (Greenwich) Meridian or
near to the Equator, care should be taken to ensure that the co-ordinates inserted are correct.
(i.e. E/W or N/S).
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 45 Edition 2009
System Alignment
8.3.3 The alignment of inertial systems must be completed and the equipment put into navigation
mode prior to releasing the parking brake at the ramp. Some systems will align in about 10 minutes, others
can take 15 minutes or more; expect alignment to take longer in extreme cold or at higher latitudes or when
the aircraft (and hence the inertial platform) is buffeted by winds or rocked during cargo loading. A rapid
realignment feature is sometimes provided but should only be used if, during an intermediate stop, it
becomes necessary to increase the system accuracy. The aircraft must be stationary during rapid realignment
which typically will take about one minute.
8.3.4 To ensure that there is adequate time for the initial alignment, the first crew member on the
flight deck should normally put the inertial system(s) into the align mode as soon as practicable.
GNSS (GPS) Systems
8.3.5 As with all LRNS operations, GPS LRNS operations must be approved by the State of the
Operator (or the State of Registry for International General Aviation operations) as part of the MNPS
operational approval. When both the LRNSs required for unrestricted MNPS operations are GPSs the
approval of their operation will include the requirement to carry out Pre-Departure Satellite Navigation
Prediction Programmes (as shown below). When only one of the two LRNSs required is a GPS, State
Authorities vary as to whether they require their operators to conduct such pre-departure programmes.
Satellite Availability
8.3.6 Given suitable geometry:
- Four satellites are required to determine 3-D position;
8.3.7 For Receiver Autonomous Integrity Monitoring (RAIM) purposes:
- Five satellites are required to detect the presence of a single faulty satellite;
8.3.8 For Fault Detection and Exclusion (FDE) purposes:
- Six satellites are required to identify a faulty satellite and exclude it from participating in
further navigation solution calculations. (Note that an FDE algorithm is normally
associated with a RAIM algorithm).
Note: the above numbers of satellites (for RAIM and FDE purposes only) may in each case be
reduced by one if barometric aiding is used.
Satellite Navigation Prediction
8.3.9 When so required, operators intending to conduct GPS navigation in MNPS Airspace must
utilise a Satellite Navigation Availability Prediction Programme specifically designated for the GPS
equipment installed. This prediction programme must be capable of predicting, prior to departure for flight
on a "specified route"*, the following:
a) Any loss of navigation coverage (meaning that less than 3 satellites will be in view to the
receiver);
and
b) Any loss of the RAIM function and its duration.
*Note: "specified route" is defined by a series of waypoints (to perhaps include the route to any
required alternate), with the time between waypoints based on planned speeds. Since flight
planned ground speeds and/or departure times may not be met, the pre-departure prediction must
be performed for a range of expected ground speeds.
8.3.10 This prediction programme must use appropriate parameters from the RAIM algorithm
employed by the installed GPS equipment. In order to perform the predictions this programme must provide
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 46 Edition 2009
the capability to manually designate satellites that are scheduled to be unavailable. Such information is not
included in the GPS almanac or ephemeris data in the navigation message (i.e. the GPS receiver does not
receive this information). Information on GPS satellite outages is promulgated via the U.S. NOTAM Office.
 
中國航空網(wǎng) m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:航空翻譯14(120)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
亚洲欧洲日夜超级视频| 国产精品一区二区三区观看| 黑人中文字幕一区二区三区| 国产对白在线播放| 又大又硬又爽免费视频| 人人爽久久涩噜噜噜网站| 91精品国产91久久久久麻豆 主演| 九九热精品视频国产| 国产在线xxxx| 国产精品日韩欧美一区二区 | 不卡一卡2卡3卡4卡精品在| 国产精品久久久久久久久粉嫩av| 欧美视频免费看欧美视频| 国产成人av网址| 日韩av免费电影| av资源一区二区| 一区二区三区四区在线视频| 国产麻豆日韩| 欧美激情一级精品国产| 国产毛片久久久久久国产毛片| 欧美激情第三页| 国产精品亚洲激情| 亚洲综合色激情五月| 成人精品一区二区三区电影免费| 一区二区三区四区国产| 99在线观看视频| 亚洲bt天天射| 国产福利片一区二区| 日本久久中文字幕| 精品国产一区久久久| 人妻有码中文字幕| 国产成人精品优优av| 欧美中日韩免费视频| 国产精品无码电影在线观看| 精品人妻少妇一区二区 | 国产三级精品网站| 色综合久综合久久综合久鬼88| 国产情侣第一页| 一区二区三区av| 91久久久久久久久久久| 日韩在线国产| 久久久国产精彩视频美女艺术照福利| 黄频视频在线观看| 国产精品日韩欧美一区二区 | 久久99国产精品| 欧美在线一区二区视频| 国产精品久久久久久亚洲调教| 国产日产欧美a一级在线| 中文字幕av导航| 91精品视频专区| 日本在线观看一区二区| 久久精品国产清自在天天线| 国产在线播放不卡| 精品国产无码在线| 91精品在线观看视频| 欧美一级黄色网| 国产精品视频免费在线| 国产午夜精品一区| 五月天婷亚洲天综合网鲁鲁鲁| 色999日韩欧美国产| 国产一二三区在线播放| 亚洲在线视频一区二区| 九色一区二区| 国产日韩av在线| 日韩中文字幕一区| 国产精品免费一区二区三区| 国产精品揄拍500视频| 日日碰狠狠丁香久燥| 久久99精品久久久久久青青日本| 男人添女人下部视频免费| 一区二区在线观| 日韩在线视频导航| 国产欧美精品在线| 日韩精品最新在线观看| 欧美wwwxxxx| 久久久久久久一区二区三区| 国产欧美在线一区二区| 日本一区二区精品视频| 欧美大片va欧美在线播放| 国产精品69久久久久| 欧美二区三区在线| 无码人妻h动漫| 久久香蕉国产线看观看av| 国产精品一区二区三区在线| 日韩精品国内| 亚洲一区二区三区免费看| 国产精品日韩二区| 久久久亚洲天堂| 国产欧美日韩在线播放| 日韩免费高清在线| 亚洲欧美日产图| 久久亚洲精品成人| 色噜噜狠狠狠综合曰曰曰88av| 国产精品亚洲自拍| 加勒比在线一区二区三区观看| 亚洲精品免费在线看| 伦理中文字幕亚洲| 北条麻妃在线一区二区| av在线com| 国产一区二区三区在线免费| 日本人妻伦在线中文字幕| 一本色道久久99精品综合| 国产精品成人一区二区三区吃奶| 日韩在线播放视频| 久久精品一区二| 97免费在线视频| 国产欧美精品久久久| 激情小视频网站| 日本一区二区三区免费观看| 亚洲欧洲三级| 国产99久久精品一区二区 夜夜躁日日躁| 久久久久久久成人| 久久久久99精品成人片| 国产欧美精品va在线观看| 蜜桃久久影院| 加勒比海盗1在线观看免费国语版| 日韩黄色片在线| 日本久久久久久久久久久| 亚洲熟妇av一区二区三区| 免费91麻豆精品国产自产在线观看| 国产精品日本精品| 久久久国产视频91| 日韩精品成人一区二区在线观看| 久久精品视频播放| 久久偷窥视频| 99电影网电视剧在线观看| 久久久精品欧美| 久久久久久国产精品一区| 九九热精品在线| 国产一区二中文字幕在线看| 九九精品在线观看| 国产一区二区中文字幕免费看| 日韩av电影免费在线| 久久精品ww人人做人人爽| 在线亚洲美日韩| 一区二区三区四区在线视频| 一区二区三区四区久久| 中文字幕无码精品亚洲资源网久久| 欧美在线视频观看免费网站| 麻豆久久久9性大片| 久久综合伊人77777| 国产一区二区自拍| 日本免费高清一区| 亚洲精品永久www嫩草| 一区二区三区电影| 亚洲欧美国产一区二区| 亚洲丰满在线| 日韩av观看网址| 欧美中文字幕在线观看| 欧美 日韩 国产 高清| 精品一区二区三区视频日产| 国产在线观看精品| 国产伦精品一区二区三区免费视频| 国产欧美高清在线| 91久久夜色精品国产网站| 久久av免费一区| 国产精品丝袜久久久久久不卡| 国产精品久久久亚洲| 国产精品久久激情| 欧美日本中文字幕| 久久久97精品| 日日橹狠狠爱欧美超碰| 成人做爽爽免费视频| 国产精品日韩在线| 亚洲精品无码久久久久久| 国产乱淫av片杨贵妃| 国产一区二区高清不卡| 久久亚洲影音av资源网| 欧美激情视频网站| 无码人妻h动漫| 欧美激情国产日韩| 高清一区二区三区四区五区| 国产精品69久久久久| 国产高潮呻吟久久久| 久久精彩免费视频| 久久久久久91| 日本视频一区二区不卡| 国内自拍欧美激情| 91精品国产91久久久久麻豆 主演| 国产成人生活片| 欧美激情一级精品国产| 日本精品免费在线观看| 国产专区一区二区三区| 91国产高清在线| 国产精品久久久久久久久电影网| 亚洲精品久久区二区三区蜜桃臀| 欧美一区二区影视| av片在线免费| 日韩亚洲在线观看| 精品国产第一页| 日本精品一区二区三区在线| 国产免费久久av| 久久国产精品一区二区三区| 精品高清视频| 欧美综合第一页| 91福利视频网| 久久91精品国产91久久跳| 青青草国产精品视频| 91精品国产沙发| 欧美激情精品久久久久久久变态|