flow of traffic to an airport. It is authorized when the
ceiling is reported or expected to be at least 1,000 feet
AGL and the visibility is at least 3 SM. Pilots must
remain clear of the clouds at all times while conducting
a visual approach. At an airport with a control tower,
pilots may be cleared to fly a visual approach to one
runway while others are conducting VFR or IFR
approaches to another parallel, intersecting, or converging runway. Also, when radar service is provided, it is
automatically terminated when the controller advises
pilots to change to the tower or advisory frequency.
CONTACT APPROACHES
If conditions permit, pilots can request a contact
approach, which is then authorized by the controller. A
contact approach cannot be initiated by ATC. This procedure may be used instead of the published procedure
to expedite arrival, as long as the airport has a SIAP or
special instrument approach procedure (special IAPs
are approved by the FAA for individual operators, but
are not published in Part 97 for public use), the reported
ground visibility is at least 1 SM, and pilots are able to
remain clear of clouds with at least one statute mile flight
visibility throughout the approach. Some advantages of
a contact approach are that it usually requires less time
than the published instrument procedure, it allows pilots
to retain the IFR clearance, and provides separation from
IFR and SVFR traffic. On the other hand, obstruction
clearances and VFR traffic avoidance becomes the
pilot’s responsibility. Unless otherwise restricted, the
pilot may find it necessary to descend, climb, or fly a
circuitous route to the airport to maintain cloud
clearance or terrain/obstruction clearance.
The main differences between a visual approach and a
contact approach are: a pilot must request a contact
approach, while a visual approach may be assigned by
ATC or requested by the pilot; and, a contact approach
may be approved with 1 mile visibility if the flight can
remain clear of clouds, while a visual approach requires
the pilot to have the airport in sight, or a preceding aircraft to be followed, and the ceiling must be at least
1,000 feet AGL with at least 3 SM visibility.
CHARTED VISUAL FLIGHT PROCEDURES
A charted visual flight procedure (CVFP) may be
established at some airports with control towers for
environmental or noise considerations, as well as
when necessary for the safety and efficiency of air traffic operations. Designed primarily for turbojet aircraft,
CVFPs depict prominent landmarks, courses, and recommended altitudes to specific runways. When pilots
are flying the Roaring Fork Visual RWY 15 shown in
figure 5-32, mountains, rivers, and towns provide
guidance to Aspen, Colorado’s Sardy Field instead
of VORs, NDBs, and DME fixes.
Pilots must have a charted visual landmark or a preceding aircraft in sight, and weather must be at or above the
published minimums before ATC will issue a CVFP
clearance. ATC will clear pilots for a CVFP if the
reported ceiling at the airport of intended landing is at
least 500 feet above the MVA/MIA, and the visibility is
3 SM or more, unless higher minimums are published
for the particular CVFP. When accepting a clearance to
follow a preceding aircraft, pilots are responsible for
maintaining a safe approach interval and wake turbulence separation. Pilots must advise ATC if unable at any
point to continue a charted visual approach or if the pilot
loses sight of the preceding aircraft.
RNAV APPROACHES
Because of the complications with database coding,
naming conventions were changed in January 2001 to
accommodate all approaches using RNAV equipment
into one classification — RNAV. This classification
includes both ground-based and satellite dependent
systems. Eventually all approaches that use some type
of RNAV will reflect RNAV in the approach title. This
changeover is being made to reflect two shifts in
instrument approach technology. The first shift is the
use of the RNP concept outlined in Chapter 2 —
Departure Procedures, in which a single performance
standard concept is being implemented for approach
procedure design. Through the use of RNP, the underlying system of navigation may not be required, provided the aircraft can maintain the appropriate RNP
standard. The second shift is that advanced avionics
systems such as FMSs, used by most airlines, needed a
new navigation standard by which RNAV could be
fully integrated into the instrument approach system.
An FMS uses multi-sensor navigation inputs to produce a composite position. Essentially, the FMS navigation function automatically blends or selects position
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:Instrument Procedures Handbook (IPH)儀表程序手冊上(133)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
99久re热视频这里只有精品6| 日本精品久久久| 欧美wwwxxxx| 日本在线视频www色| 国内精品一区二区三区四区| 国语精品中文字幕| 国产精彩精品视频| 欧美激情视频网| 经典三级在线视频| 久久99精品久久久久子伦| 欧美大成色www永久网站婷| 午夜精品亚洲一区二区三区嫩草| 欧美 日本 亚洲| 久久偷看各类wc女厕嘘嘘偷窃| 久久综合色影院| 日本免费成人网| 97免费视频在线播放| 国产成人精品一区二区| 日本欧美国产在线| www.男人天堂网| 色综合色综合网色综合| 国产主播在线看| 国产精品无码免费专区午夜 | 国产精品狠色婷| 欧洲午夜精品久久久| 91精品美女在线| 中文字幕不卡每日更新1区2区| 欧美一区二视频在线免费观看| 久久久欧美精品| 亚洲精品中文字幕乱码三区不卡| 国产欧美一区二区在线播放| 国产精品视频网址| 欧美日韩黄色一级片| av一区二区三区免费观看| 欧美成年人在线观看| 午夜精品一区二区三区在线观看 | www.欧美精品一二三区| 天天摸天天碰天天添| 91精品久久久久久| 亚洲欧美日韩精品久久久| 国产精品综合久久久久久| 欧美情侣性视频| 国产又粗又长又爽视频| 欧美情侣性视频| av免费中文字幕| 亚洲精品久久区二区三区蜜桃臀 | 国产精品最新在线观看| 免费99精品国产自在在线| 激情小说网站亚洲综合网| 久久www视频| 欧美在线视频观看| 国产成人精品一区二区三区福利| 欧美最猛性xxxx| 久久久噜噜噜久久中文字免| 性色av一区二区咪爱| 国产精品69久久久| 日韩一级免费看| 国产成人免费电影| 天天爱天天做天天操| 国产成人精品av在线| 任我爽在线视频精品一| 国产精品日本一区二区| 国产精品揄拍500视频| 欧美激情亚洲国产| 久久精品综合一区| 欧美日韩在线不卡一区| 欧美猛交免费看| www插插插无码免费视频网站| 91国产美女视频| 欧洲精品亚洲精品| 久久成年人视频| 97精品国产97久久久久久粉红| 在线视频一区观看| 91久久伊人青青碰碰婷婷| 日日碰狠狠躁久久躁婷婷| 国产国语刺激对白av不卡| 免费高清一区二区三区| 天堂一区二区三区| 精品伦精品一区二区三区视频| …久久精品99久久香蕉国产| 精品一区久久久久久| 日韩av在线第一页| 欧美激情精品久久久| 久久色在线播放| 国产成人精品电影久久久| 成人国产一区二区三区| 国内自拍欧美激情| 欧美在线免费观看| 亚洲一区三区视频在线观看| 久久久久99精品久久久久| 国产高清一区视频| 国产精品一区而去| 精品人妻大屁股白浆无码| 日韩中文在线字幕| 中国丰满熟妇xxxx性| 国产精品久久久久久影视| 久久精品女人的天堂av| 91老司机精品视频| 国产乱人伦精品一区二区三区 | 热久久99这里有精品| 亚洲一二区在线| 国产精品久久久久久久久久新婚 | 精品日本一区二区| 欧美又大粗又爽又黄大片视频| 伊人久久在线观看| 久久99精品国产99久久6尤物 | 日本a在线天堂| 天天夜碰日日摸日日澡性色av| 色综合久久天天综线观看| 国产精品成人aaaaa网站| 九九九九九精品| 久久精品国产美女| 国产高清一区视频| 97免费在线视频| 成人久久一区二区| 国产欧美精品久久久| 国产女主播一区二区| 国产日韩欧美在线看| 蜜桃视频成人| 毛片一区二区三区四区| 免费黄色福利视频| 黄色高清视频网站| 国内精品久久久| 国模视频一区二区| 麻豆精品传媒视频| 国产日韩视频在线观看| 国产日本欧美在线观看| 国产一区二区视频免费在线观看| 欧美一级成年大片在线观看| 欧美图片激情小说| 黄www在线观看| 国产原创中文在线观看| 国产香蕉一区二区三区| 国产精选一区二区| 91久色国产| 久久人人爽人人爽人人av| 久久国产亚洲精品无码| 日韩最新在线视频| 国产精品视频中文字幕91| 国产精品久久av| 色综合天天狠天天透天天伊人| 免费av在线一区| 亚洲www在线| 日韩一区免费观看| 日本a在线免费观看| 免费在线观看亚洲视频| 国产日韩在线播放| 97久久精品国产| 日韩亚洲欧美中文在线| 国产精品免费在线| 中文字幕在线中文| 日本一区不卡| 韩国一区二区三区美女美女秀| 国产另类第一区| 久久影院理伦片| 国产成人欧美在线观看| 久久99亚洲精品| 日本一区二区三区在线播放| 日本精品免费在线观看| 黄色一级片国产| 99亚洲国产精品| 久久精品国产理论片免费| 国产精品毛片一区视频| 欧美激情综合亚洲一二区| 少妇免费毛片久久久久久久久| 欧美中文在线视频| 国产精品一区二区不卡视频| 久久99精品久久久久久久久久| 国产精品免费一区| 亚洲国产欧洲综合997久久| 欧美一区免费视频| 粉嫩av一区二区三区免费观看| 国产a级黄色大片| 国产精品视频男人的天堂| 亚洲精品中文字幕乱码三区不卡| 欧美日韩一区二区三区免费| 成人一级生活片| 色伦专区97中文字幕| 欧美日韩福利电影| 日韩精品一区二区三区不卡| 国产欧亚日韩视频| 丝袜美腿亚洲一区二区| 欧美激情一区二区三级高清视频| 无码人妻精品一区二区三区99v| 欧美 日韩 激情| 国产精品一区二区三区久久久| 国产精品免费看一区二区三区| 日本特级黄色大片| 亚洲国产成人不卡| 131美女爱做视频| 国产精品美女久久| 日韩一级特黄毛片| 成人精品久久一区二区三区| 91精品视频在线看| 久久精品免费播放| 少妇av一区二区三区无码 | 91国偷自产一区二区三区的观看方式 | 亚洲最大av网| 国产精品久久视频| 国产成人精品福利一区二区三区|