国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 飛行資料 >

時間:2010-06-11 13:06來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

consideration aircraft factors. For example, the PZ landing direction may change if the wind changes
significantly. Additionally, the aviation representative can offer advice on surface conditions and their effect
on helicopter operations.
(4) Pickup zone communications. Communications must be by the most secure means available. PZ
FM 1-113 Chapter 3
3-11
operations may be conducted under radio listening silence to avoid electronic detection. This requires
detailed planning. If under radio listening silence, it is imperative that aircrews remain on schedule to allow
the PZCO to keep a smooth flow of troops from the PZ. PZ communications will be accomplished on the
established FM PZ control net, with transmissions kept to a minimum.
(5) Pickup zone marking. The PZCO directs the marking of the PZ. PZ marking must be done so that the PZ
is identifiable from the air. Far and near recognition signals are needed, especially at night, to allow the
pilots to orient on the PZ quickly. Touchdown points must be clearly marked. The PZCO must ensure that no
other lighting is on the PZ. Extraneous lights in the area of the PZ will cause confusion to the aircrews and
result in slow loading times and delayed air assault times.
(6) Disposition of loads on the pickup zone. Personnel and equipment must be positioned on the PZ to
conform with the landing formation. Flight crews must understand the loading plan on the PZ, and be
prepared to accept troops and equipment immediately on landing. PZ sketches depicting location of loads in
the PZ will assist flight crews in loading troops and equipment quickly once the aircraft arrive in the PZ.
Flight crews should be provided a PZ diagram. Figure 3-4 shows an example of a PZ diagram. Figure 3-5
shows the duties of the PZCO and the aviation LNO during the execution of the PZ operations.
LEGEND: See the glossary for acronyms and abbreviations.
Figure 3-4. PZ operations
FM 1-113 Chapter 3
3-12
Figure 3-5. PZCO and LNO PZ responsibilities
(7) Air cavalry/attack helicopters in support of the loading plan. During the loading phase, the attack and
cavalry aircraft can assist the AATFC by providing overwatch of the PZs and by conducting a route
reconnaissance of the air assault flight routes.
e. Staging Plan. The staging plan is based on the loading plan and prescribes the proper order for movement of
personnel and aircraft to the PZ. Loads must be ready before the aircraft arrive at the PZ. During mission planning,
the PZCO determines the time required to set up the PZ and selects times (based upon the air assault H-hour) that
the PZ control group will establish the PZ. During the staging plan, the aviation unit is conducting mission
planning, orders, and necessary checks to ensure that the mission times are met once the air assault is executed.
During the staging plan, the aviation unit should be focusing on mission planning, precombat checks and
inspections, FARP operations, and routes to the PZ.
(1) Mission planning. Mission planning includes the coordination between the AATF and the AMC,
development of the aviation OPORD, issuing of the OPORD and AB, and rehearsals.
FM 1-113 Chapter 3
3-13
(2) Precombat checks and inspections. During the staging plan, the aircraft are prepared for the operation.
Unit commanders ensure that aircraft have sufficient fuel, COMSEC fills are loaded and equipment is
operational, cargo hooks are operational, and aircraft log books and keys are accessible. They also ensure
that aircraft are prepared to accept the loads for the air assault (internal or external).
(3) Forward arming and refueling point operations. If a FARP will be used during the air assault mission, it
must be planned and positioned during the staging plan. Consideration should be given to site selection, time
required to be operational, travel time, safety inspection criteria, and night set-up considerations (if
applicable).
(4) Routes to the pickup zone. The AMC must select flight routes to the PZ that allow the aircraft to arrive at
the PZ on time in the proper landing direction and configuration to accept loads.
3-8. AIR ASSAULT PLANNING
The success of any mission depends largely on the planning process. This section is designed to assist in the planning of
the air assault operation. The time available for planning an air assault operation will vary. However, enough planning
time must be allotted for detailed planning and synchronization to occur. For company level air assaults, a minimum of 24
hours should be allotted for air assault planning. For battalion and brigade level air assaults, 72 hours should be allotted
for air assault planning. Air assault operations involving small numbers of aircraft and personnel (LRSD, scout insertions)
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:運輸直升機操作手冊(24)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
亚洲一区中文字幕| 色妞久久福利网| 高清欧美性猛交| 久久久久久九九九九| 久久久久久国产精品美女| 青草青草久热精品视频在线观看| 国产欧美日韩精品专区| 国产精品88久久久久久妇女| 国产精品久久久久aaaa九色| 日韩资源av在线| 国产九区一区在线| 国产精品三级在线| 欧美一级日本a级v片| 成人免费视频97| 国产精品久久99久久| 日本不卡一二三区| 91精品国产91久久久久久| 国产精品高潮呻吟视频| 青春草在线视频免费观看| 91久色国产| 一区国产精品| 国产日韩欧美在线| 国产精品丝袜一区二区三区| 一区国产精品| 国产日韩在线视频| 国产精品免费入口| 日韩免费黄色av| 久久久久99精品成人片| 亚洲精品一区二| 粉嫩av一区二区三区天美传媒| 国产精品日日做人人爱| 欧美亚洲国产另类| 久久久久久久影院| 日本高清一区| 久久99精品久久久久久秒播放器| 性高潮久久久久久久久| 97久久精品国产| 亚洲视频欧美在线| 国产免费一区二区三区在线能观看| 国产精品欧美风情| 欧美极品视频一区二区三区| 国产成人精品在线视频| 免费不卡亚洲欧美| 国产精品久久久久影院日本| 欧美一级免费视频| 久久精品国产一区二区三区日韩| 国产99视频在线观看| 99久久久精品免费观看国产| 伊人婷婷久久| 国产大尺度在线观看| 日韩精品一区二区免费| 日韩亚洲欧美中文在线| 欧美在线精品免播放器视频| 久久久久久久国产精品| 欧美中文字幕在线视频| 国产精品视频一区二区三区四区五区| 欧美精品第三页| 国产精品福利视频| 国产精品一区二区欧美| 亚洲一区制服诱惑| 久久综合九色综合网站| 日本电影亚洲天堂| 国产精品偷伦免费视频观看的| 国模吧一区二区| 欧美激情在线一区| 久久亚洲综合网| 欧美日韩天天操| 国产精品国产自产拍高清av水多| 蜜桃日韩视频| 中文字幕在线亚洲三区| 久久久影视精品| 青青草成人在线| 欧美激情精品久久久久久大尺度| 97碰碰碰免费色视频| 日韩网站在线免费观看| 国产精品视频yy9099| 国产乱码精品一区二区三区日韩精品| 亚洲精品中文字幕乱码三区不卡| 久久久久亚洲av无码专区喷水| 欧美日韩一区二区三区免费| 久久久久国产精品免费| 久久频这里精品99香蕉| 欧美精品一区二区视频| 国产精品三区www17con| 国模吧一区二区三区| 亚洲熟妇av日韩熟妇在线| 国产伦理久久久| 日本香蕉视频在线观看| 欧美精品在线视频观看| 91精品国产91久久久久久最新 | 久久一区免费| 女女同性女同一区二区三区按摩| 美女国内精品自产拍在线播放| 久久这里只有精品23| 人妻少妇精品无码专区二区| 国产精品欧美久久久| 国产精品av免费观看| 精品视频一区二区在线| 日本香蕉视频在线观看| 在线观看国产一区| 国产精品我不卡| 国产高清在线精品一区二区三区| 国产午夜福利视频在线观看| 日韩欧美亚洲v片| 欧美精品video| 国产精品少妇在线视频| 国产v综合v亚洲欧美久久| 国产精品永久免费观看| 欧美日韩激情四射| 亚洲 高清 成人 动漫| xxx一区二区| 久久久水蜜桃| 国产又大又硬又粗| 欧洲精品视频在线| 亚洲精品日韩成人| 日韩视频在线观看国产| 人妻无码视频一区二区三区| 久久久999国产精品| 欧美日韩亚洲一区二区三区四区 | 国产欧美日韩中文字幕在线| 国产精品久久综合av爱欲tv| 欧美一级视频在线观看| 欧美精品与人动性物交免费看| 亚洲二区自拍| 日韩免费一级视频| 日韩免费精品视频| 欧美日韩国产999| 久久久久一区二区| 国产精品后入内射日本在线观看| 久久综合中文色婷婷| 国产老熟妇精品观看| 黄色片网址在线观看| 欧洲久久久久久| 欧美中文字幕视频在线观看| 色婷婷精品国产一区二区三区| 欧美日本中文字幕| 一区高清视频| 国产精品久久久久久久久久久久久久 | 亚洲最大成人在线| 国产精品久久久久999| 精品国产一区二区三区四区在线观看| 日韩在线视频国产| 国产激情综合五月久久| 久久久久久久激情| 久久久久久免费精品| yellow视频在线观看一区二区| 国产精品自产拍在线观看| 国产日本欧美在线| 91久久精品美女高潮| av天堂永久资源网| 久久久久狠狠高潮亚洲精品| 91精品国产乱码久久久久久久久 | 国产日本一区二区三区| 国产日韩av网站| 国产专区一区二区三区| 国产一区二区在线播放| 国产欧美日韩小视频| 91久久精品国产| 久久综合伊人77777麻豆| 日韩视频永久免费观看| www.欧美精品一二三区| 国产精品久久九九| 麻豆乱码国产一区二区三区| 国产精品成人观看视频免费| 欧美成人亚洲成人| 久久久久国产精品一区| 亚洲国产精品久久久久爰色欲| 亚洲 日韩 国产第一区| 日本www在线播放| 欧洲亚洲免费视频| 男人添女人下部视频免费| 国产淫片av片久久久久久| 国产一区二区视频播放| 粉嫩av一区二区三区免费观看| 91免费在线观看网站| 久久综合精品一区| 久久久久久久久久久免费| 国产精品污www一区二区三区| 国产精品福利在线| 亚洲综合一区二区不卡| 欧美一级在线看| 欧美午夜欧美| 欧美主播一区二区三区美女 久久精品人 | 久久精品视频99| 国产成人中文字幕| 国产成人精品一区二区三区| 久久精品国产99国产精品澳门| 国产精品久久久久久久久久ktv | 欧美亚洲视频一区| 国产伦精品一区二区三区四区视频| 91精品中文在线| 日韩中文字幕在线视频| 久久亚洲私人国产精品va| 亚洲巨乳在线观看| 欧美亚洲另类在线| 国产精品亚洲第一区| 九色综合婷婷综合| 九九久久精品一区| 欧洲精品亚洲精品| 国产精品一区二|