国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 > FAA >

時間:2011-04-18 01:03來源:藍天飛行翻譯 作者:航空
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

20.1.2.3 In SOIA, the approach course separation (instead of the runway separation) meets established close parallel approach criteria. Refer to FIG ENR 1.5.31 for the generic SOIA approach geometry. A visual segment of the LDA/PRM approach is established between the LDA MAP and the runway threshold. Aircraft transition in visual conditions from the LDA course, beginning at the LDA MAP, to align with the runway and can be stabilized by 500 feet above ground level (AGL) on the extended runway centerline. Aircraft will be “paired” in SOIA operations, with the ILS aircraft ahead of the LDA aircraft prior to the LDA aircraft reaching the LDA MAP. A cloud ceiling for the approach is established so that the LDA aircraft has nominally 30 seconds to acquire the leading ILS aircraft prior to the LDA aircraft reaching the LDA MAP. If visual acquisition is not accomplished, a missed approach must be executed.
20.2 Requirements.
20.2.1 Besides system requirements as identified in subparagraph 20.1 above all pilots must have completed special training before accepting a clearance to conduct ILS/PRM or LDA/PRM Simultaneous Close Parallel Approaches.
20.2.1.1 Pilot Training Requirement. Pilots must complete special pilot training, as outlined below, before accepting a clearance for a simultaneous close parallel ILS/PRM or LDA/PRM approach.
 a) For operations under 14 CFR Parts 121, 129, and 135 pilots must comply with FAA approved company training as identified in their Operations Specifications. Training, at a minimum, must require pilots to view the FAA video “ILS PRM AND SOIA APPROACHES: INFORMATION FOR AIR CAR-RIER PILOTS.” Refer to http://www.faa.gov for additional information and to view or download the video.
 b) For operations under Part 91:
 1) Pilots operating transport category aircraft must be familiar with PRM operations as contained in this section of the Aeronautical Information Publication (AIP). In addition, pilots operating transport category aircraft must view the FAA video “ILS PRM AND SOIA APPROACHES: IN-FORMATION FOR AIR CARRIER PILOTS.” Refer to http://www.faa.gov for additional informa-tion and to view or download the video.
 2) Pilots not operating transport category aircraft must be familiar with PRM and SOIA operations as contained in this section of the AIP.  The FAA strongly recommends that pilots not involved in transport category aircraft operations view the FAA video, “ILS PRM AND SOIA APPROACHES: INFORMATION FOR GENERAL AVIATION PILOTS.” Refer to http://www.faa.gov for addition-al information and to view or download the video.

FIG ENR 1.5.32
SOIA Approach Geometry

NOTE. 
SAP  The SAP is a design point along the extended centerline of the intended landing runway on the 
glide slope at 500 feet above the landing threshold. It is used to verify a sufficient distance is 
provided for the visual maneuver after the missed approach point (MAP) to permit the pilots to 
conform to approved, stabilized approach criteria. 
MAP  The point along the LDA where the course separation with the adjacent ILS reaches 3,000 feet. 
The altitude of the glide slope at that point determines the approach minimum descent altitude 
and is where the NTZ terminates. Maneuvering inside the MAP is done in visual conditions. 
Angle  Angle formed at the intersection of the extended LDA runway centerline and a line drawn between 
the LDA MAP and the SAP. The size of the angle is determined by the FAA SOIA computer design 
program, and is dependent on whether Heavy aircraft use the LDA and the spacing between the 
runways. 
Visibility  Distance from MAP to runway threshold in statute miles (light credit applies). 
Procedure  LDA aircraft must see the runway landing environment and, if less than standard radar 
separation exists between the aircraft on the adjacent ILS course, the LDA aircraft must visually 
acquire the ILS aircraft and report it in sight to ATC prior to the LDA MAP. 
CC  Clear Clouds. 

Federal Aviation Administration Twentieth Edition
20.2.1.2 ATC Directed Breakout. An ATC di-rected “breakout” is defined as a vector off the ILS or LDA approach course in response to another aircraft penetrating the NTZ, the 2,000 foot wide area located equidistance between the two approach courses that is monitored by the PRM monitor controllers.
20.2.1.3 Dual Communications. The aircraft fly-ing the ILS/PRM or LDA/PRM approach must have the capability of enabling the pilot/s to listen to two communications frequencies simultaneously.
20.3 Radar Monitoring. Simultaneous close par-allel ILS/PRM and LDA/PRM approaches require that final monitor controllers utilize the PRM system to ensure prescribed separation standards are met. Procedures and communications phraseology are also described in paragraph 19., Simultaneous Parallel ILS/MLS Approaches (Independent). A minimum of 3 miles radar separation or 1,000 feet vertical separation will be provided during the turn.on to close parallel final approach courses. To ensure separation is maintained, and in order to avoid an imminent situation during simultaneous close parallel ILS/PRM or SOIA ILS/PRM and LDA/PRM approaches, pilots must immediately comply with PRM monitor controller instructions. In the event of a missed approach, radar monitoring is provided to one.half mile beyond the most distant of the two runway departure ends for ILS/RPM approaches. In SOIA, PRM radar monitoring terminates at the LDA MAP. Final monitor controllers will not notify pilots when radar monitoring is terminated.
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:美國航行情報匯編 AERONAUTICAL INFORMATION PUBLICATION AIP 2(107)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
99视频在线免费观看| 国产精品男人爽免费视频1| 91美女片黄在线观看游戏| 久久国产欧美精品| 日韩在线一区二区三区免费视频| 另类色图亚洲色图| 亚洲激情电影在线| 国产一区玩具在线观看| 久久久久免费看黄a片app| 尤物国产精品| 国产乱码精品一区二区三区日韩精品| 久久人人爽人人爽人人av| 国产精品污www一区二区三区| 亚洲国产精品www| 国产热re99久久6国产精品| 国产成人亚洲综合青青| 九九九久久国产免费| 国产在线一区二区三区四区| 深夜成人在线观看| 天天操天天干天天玩| 国产精品99久久99久久久二8| 欧美麻豆久久久久久中文| 欧美专区日韩视频| 99国产视频| 中文字幕在线乱| 成人国产精品av| 一区二区三区四区免费观看| 成人av在线不卡| 美日韩精品视频免费看| 免费看污久久久| 国产精品电影一区| 欧美亚洲另类激情另类| 国产精品视频白浆免费视频| 国产日韩换脸av一区在线观看| 国产精品国产福利国产秒拍| 国产午夜伦鲁鲁| 国产精品第一区| 国产日韩成人内射视频| 午夜老司机精品| 久久久久久久久一区| 欧美精品欧美精品| 一区二区在线不卡| 国产成人综合一区| 国产一区二区丝袜| 亚洲精品自在在线观看| 欧美日本国产在线| 国产成人手机视频| 在线播放豆国产99亚洲| 高清在线观看免费| 欧美在线一区视频| 国产美女久久精品香蕉69| 国产精品久久亚洲7777| 国内精品**久久毛片app| 国产精品视频不卡| 人人妻人人澡人人爽欧美一区 | 日韩最新在线视频| 欧美国产综合在线| 日韩极品视频在线观看| 国产精品人人做人人爽| 欧美精品一区在线| 久久国产天堂福利天堂| 久久青青草综合| 日韩精品不卡| 国产成人精品网站| 日韩av色综合| 国产精品久久久久久久免费大片 | 国产淫片免费看| 自拍另类欧美| 国产www精品| 欧美极品欧美精品欧美图片| 国产精品高潮粉嫩av| 99久re热视频这里只有精品6| 熟女视频一区二区三区| 久久久精品国产网站| 国产日韩欧美91| 亚洲成人一区二区三区| 久久99久久精品国产| 国产特级黄色大片| 五月天在线免费视频| 国产成人精品免费看在线播放| 黄色影院一级片| 亚洲中文字幕无码中文字| 国产成人无码a区在线观看视频 | 国产精品自产拍在线观看 | 欧美日韩视频免费| 亚洲精品国产精品国自产| 色偷偷av亚洲男人的天堂| 精品婷婷色一区二区三区蜜桃| 亚洲mm色国产网站| 国产精品久久久久久久天堂| 国产日韩欧美精品| 日韩精品在在线一区二区中文| 国产精品电影久久久久电影网| 久久福利电影| 国产精品自拍合集| 国模吧一区二区| 日本一区视频在线观看| 欧美精品在线极品| 国产成人无码av在线播放dvd| 免费av一区二区三区| 日韩中文字幕组| 欧美精品免费播放| 久久精品国亚洲| 国产精品99久久久久久久| 成人国产一区二区| 国模视频一区二区| 中文字幕无码精品亚洲资源网久久| 国产成人精品最新| 久热这里只精品99re8久| 成人免费毛片网| 精品91免费| 日本久久久a级免费| 九九久久久久久久久激情| www国产亚洲精品久久网站| 久久黄色免费看| av免费精品一区二区三区| 黄色小网站91| 激情五月婷婷六月| 琪琪亚洲精品午夜在线| 日本精品久久久久中文字幕| 亚洲一区二区中文| 久久九九免费视频| 久久久噜噜噜久久久| 91精品久久久久久久久青青| 成人精品久久久| 国产青青在线视频| 国产在线高清精品| 日本免费高清一区| 伊人久久大香线蕉精品| 中文字幕久久综合| 欧美激情视频一区二区| 欧美激情极品视频| 精品久久久久久久免费人妻| 国产精品久在线观看| 久久久久久久9| 久草视频这里只有精品| 久久av免费观看| 久久影视中文粉嫩av| 久久免费视频2| 国产精品av一区| 九九久久99| 色青青草原桃花久久综合| 日韩一区二区精品视频| 久久精品在线免费视频| 久久99国产精品99久久| 九九久久九九久久| 成人久久精品视频| 91精品在线观| 91成人国产在线观看| 国产成人a亚洲精v品无码| 久久人91精品久久久久久不卡| 免费国产在线精品一区二区三区| 国产一区二区三区奇米久涩 | 欧美午夜欧美| 日本精品在线视频| 亚洲.欧美.日本.国产综合在线 | 男人天堂av片| 免费看成人午夜电影| 国产精品一区久久久| 99热一区二区三区| www.日本少妇| 国产高清精品在线观看| 久草精品在线播放| 国产精品极品在线| 中文字幕欧美日韩一区二区| 欧美一区二区三区四区夜夜大片| 午夜精品久久久久久99热 | 久久av红桃一区二区小说| 九九久久国产精品| 日韩av不卡在线播放| 人妻久久久一区二区三区| 国产原创精品| 成人福利视频网| 国产精品91久久| 久久久久天天天天| 国产精品视频播放| 中文字幕黄色大片| 日本久久久久久| 欧美精品一区在线| 成人短视频在线观看免费| 久久久av水蜜桃| 欧美日韩福利电影| 日韩在线电影一区| 国模一区二区三区私拍视频| 成人福利视频网| www.欧美免费| 欧美怡春院一区二区三区| 红桃一区二区三区| 国产精品12345| 国产精品久久在线观看| 视频一区国产精品| 国产小视频免费| 日韩一区二区三区国产| 欧美日产国产成人免费图片| 天天干天天色天天爽| 国产精品伊人日日| 国产精品精品国产| 青青草成人网| 91精品视频观看| 免费99精品国产自在在线|