国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-05-10 19:29來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

made to the flight plan en route due to deteriorating
weather, the dispatcher will maintain contact with the
flight crew and will reroute their flight as necessary.
Therefore, it is the pilot’s responsibility to execute the
flight as planned by the dispatcher; this is especially true
for Part 121 pilots. To aid in the planning of alternates,
dispatchers have a list of airports that are approved as
alternates so they can quickly determine which airports
should be used for a particular flight. Dispatchers also
use flight-planning software that plans routes including
alternates for the flight. This type of software is tailored
for individual operators and includes their normal flight
paths and approved airports. Flight planning software
and services are provided through private sources.
Though the pilot is the final authority for the flight and
ultimately has full responsibility, the dispatcher is
responsible for creating flight plans that are accurate and
comply with the CFRs. Alternate minimum criteria are
only used as planning tools to ensure the pilot-in-command and dispatcher are thinking ahead to the approach
phase of flight. In the event the flight would actually
need to divert to an alternate, the published approach
minimums or lower-than-standard minimums must be
used as addressed in OpsSpecs documents.
DEPARTURE PROCEDURES
Departure procedures are preplanned routes that provide
transitions from the departure airport to the en route
structure. Primarily, these procedures are designed to
provide obstacle protection for departing aircraft. They
also allow for efficient routing of traffic and reductions
in pilot/controller workloads. These procedures come in
many forms, but they are all based on the design criteria
outlined in TERPS and other FAA orders. The A/FD
includes information on high altitude redesign RNAV
routing pitch points, preferred IFR routings, or other
established routing programs where a flight can begin a
segment of nonrestrictive routing.
DESIGN CRITERIA
The design of a departure procedure is based on TERPS,
a living document that is updated frequently. Departure
design criterion assumes an initial climb of 200 feet per
nautical mile (NM) after crossing the departure end of
the runway (DER) at a height of at least 35 feet. [Figure
2-15] The aircraft climb path assumption provides a
minimum of 35 feet of additional obstacle clearance
above the required obstacle clearance (ROC), from the
DER outward, to absorb variations ranging from the
distance of the static source to the landing gear, to differences in establishing the minimum 200 feet per NM
climb gradient, etc. The ROC is the planned separation
between the obstacle clearance surface (OCS) and the
required climb gradient of 200 feet per NM. The ROC
value is zero at the DER elevation and increases along
the departure route until the appropriate ROC value is
attained to allow en route flight to commence. It is
typically about 25 NM for 1,000 feet of ROC in nonmountainous areas, and 46 NM for 2,000 feet of ROC
in mountainous areas.
Recent changes in TERPS criteria make the OCS lower
and more restrictive. [Figure 2-16 on page 2-14]
However, there are many departures today that were
evaluated under the old criteria [Figure 2-15] that
allowed some obstacle surfaces to be as high as 35 feet
at the DER. Since there is no way for the pilot to determine whether the departure was evaluated using the
2-13
previous or current criteria and until all departures have
been evaluated using the current criteria, pilots need to
be very familiar with the departure environment and
associated obstacles especially if crossing the DER at
less than 35 feet.
Assuming a 200-foot per NM climb, the departure is
structured to provide at least 48 feet per NM of clearance above objects that do not penetrate the obstacle
slope. The slope, known as the OCS, is based on a 40 to
1 ratio, which is the equivalent of a 2.5 percent or a 152-
foot per NM slope. As a result, a departure is designed
using the OCS as the minimum obstacle clearance, and
then by requiring a minimum climb gradient of 200 feet
per NM, additional clearance is provided. The departure
design must also include the acquisition of positive
course guidance (PCG) typically within 5 to 10 NM of
the DER for straight departures and within 5 NM after
turn completion on departures requiring a turn. Even
when aircraft performance greatly exceeds the minimum
climb gradient, the published departure routing must
always be flown.
Airports declaring that the sections of a runway at one
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:Instrument Procedures Handbook (IPH)儀表程序手冊下(44)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
欧美一区在线直播| 不卡一区二区三区四区五区| 国产中文字幕视频在线观看| 久久96国产精品久久99软件| 亚洲国产精品一区在线观看不卡| 欧美变态另类刺激| 日韩中文字幕视频在线观看| 亚洲97在线观看| 91久久伊人青青碰碰婷婷| 欧美精品做受xxx性少妇| 好吊色欧美一区二区三区| 啊v视频在线一区二区三区| 三级网在线观看| 国产精品99久久久久久大便| 一区二区三区的久久的视频| 国产日韩一区二区| 欧美成人午夜剧场免费观看| 国产在线xxxx| 精品国产一区二区三区免费| 免费观看精品视频| 久久久成人的性感天堂| 欧美一区视久久| 国产精品免费久久久久影院| 黄黄视频在线观看| 久久国产精品久久精品| 国产精品有限公司| 一本久道久久综合狠狠爱亚洲精品| 9a蜜桃久久久久久免费| 都市激情久久久久久久久久久| 久久综合九色综合网站| 日本午夜精品一区二区三区| 久久久久久有精品国产| 青青草影院在线观看| 久久精品久久精品亚洲人| 精品人妻少妇一区二区| 国产精品乱码| 国产美女精彩久久| 亚洲精品一区二区三区樱花| 久久久亚洲福利精品午夜| 奇米一区二区三区四区久久| 国产成人精品一区二区三区| 国产综合色香蕉精品| 久久999免费视频| 91精品天堂| 日韩精品极品视频在线观看免费| 国产精品视频在线免费观看| 国产日韩久久| 亚州国产精品久久久| 久久人人爽人人爽人人片亚洲| 国产天堂在线播放| 亚洲精品欧洲精品| 久久精品国产亚洲7777| 国产欧美日韩免费看aⅴ视频| 亚洲精品视频一二三| 久久精品国产久精国产一老狼| 国产免费一区二区三区在线观看 | 免费看国产一级片| 亚洲人久久久| 日韩视频在线一区| 国产精品一区二区3区| 日本一本a高清免费不卡| 国产精品国产亚洲伊人久久| 91福利视频导航| 日本中文字幕在线视频观看| 国产精品欧美日韩一区二区| 国产精品一区二区久久久| 日本中文字幕亚洲| 另类天堂视频在线观看| 国产成人一区三区| 国产日韩欧美在线视频观看| 日韩a在线播放| 欧美激情18p| 精品国产欧美一区二区五十路 | 日韩videos| 精品国产一区二区三区四区精华 | 国产精品99一区| 黄网站欧美内射| 亚洲国产另类久久久精品极度| 精品久久久91| 不卡一区二区三区四区五区| 欧美精品一区在线发布| 亚洲区一区二区三区| 国产成人精品自拍| 7777免费精品视频| 国产淫片免费看| 日本精品视频在线观看| 亚洲最新免费视频| 色狠狠久久aa北条麻妃| 99在线精品免费视频| 国产在线精品日韩| 人人妻人人澡人人爽欧美一区 | 国产欧美在线一区二区| 日韩视频在线视频| 亚洲一区二区三区在线免费观看| 国产精品欧美亚洲777777| 国产成人黄色片| aaa免费在线观看| 欧美精品v日韩精品v国产精品| 亚洲va码欧洲m码| 欧美激情亚洲另类| 国产精品乱码一区二区三区| 丝袜美腿精品国产二区| 91久久国产自产拍夜夜嗨 | 国产午夜福利100集发布| 人妻精品无码一区二区三区| 欧美一级免费在线观看| 亚洲综合色激情五月| 久久这里有精品| 久久久精品久久| 91精品视频播放| 国产精品永久免费视频| 免费国产在线精品一区二区三区| 欧美一级成年大片在线观看| 日产精品久久久一区二区| 亚洲影视九九影院在线观看| 欧美激情精品久久久久久变态| 国产精品福利网站| 国产精品久久久久久久久久久久久久| 日韩亚洲一区二区| 国产av人人夜夜澡人人爽麻豆| 国产精品av在线| 欧美精品一区在线发布| 欧美精品一区免费| 免费看欧美一级片| 欧美日韩一区二区三区电影| 欧美在线视频免费| 欧美中文字幕在线视频| 琪琪亚洲精品午夜在线| 人妻内射一区二区在线视频| 日本韩国在线不卡| 欧美在线播放cccc| 欧美性受xxx| 加勒比在线一区二区三区观看| 欧美大香线蕉线伊人久久| 欧美性资源免费| 精品免费视频123区| 国产尤物91| 国产乱人伦真实精品视频| 国产精品又粗又长| 国产美女久久精品| 成人国产精品一区二区| 91久热免费在线视频| 久久琪琪电影院| 久草热视频在线观看| 精品国产一区二区三区四区在线观看| 日日骚av一区| 国产精品美女诱惑| 精品国产一区二区三区麻豆免费观看完整版| 国产精品久久九九| 亚洲尤物视频网| 日本免费高清一区二区| 欧美性大战久久久久xxx| 精品少妇在线视频| 成人福利视频网| 国产成人综合精品| 国产超级av在线| 国产精品丝袜一区二区三区 | 日韩欧美第二区在线观看| 任我爽在线视频精品一| 精品视频一区二区三区四区| 99国产在线| www.精品av.com| 精品免费日产一区一区三区免费 | 天天在线免费视频| 欧洲精品久久| 国产亚洲福利社区| 91精品国产综合久久久久久久久| 久久精品无码中文字幕| 久久亚洲综合国产精品99麻豆精品福利| 久久久久久国产精品久久| 日本不卡一区| 国产无限制自拍| 久久噜噜噜精品国产亚洲综合| 国产精品入口芒果| 亚洲午夜精品久久久中文影院av| 亚洲一区二区三区在线视频| 欧洲熟妇精品视频| 成人福利网站在线观看| xvideos亚洲| 这里只有精品66| 欧美日韩精品在线一区二区| 99久久综合狠狠综合久久止| zzjj国产精品一区二区| 亚洲制服中文| 欧美国产二区| 国产精品999999| 蜜月aⅴ免费一区二区三区| 日韩国产精品毛片| 国产麻豆日韩| www国产精品com| 中文字幕在线乱| 欧美日韩亚洲一区二区三区四区| 91免费版看片| 久精品免费视频| 欧美一区二区影视| 久久免费在线观看| 中文字幕日韩一区二区三区| 激情深爱综合网| 久久久久久久久久久视频| 夜夜添无码一区二区三区|