 (6)  Source Overload (Galleys and Utility Buses Shed)
 (a)  
Source overload shedding is controlled by the BPCU. The BPCU monitors the load supplied by both IDGs, the APU generator, and external power. Source overload shedding occurs when: 1) The airplane is on the ground or inflight, and 2) any source (L IDG, R IDG, APU, or EXT PWR) is loaded,

 a) above 90 kva for 4.5 minutes, or b) above 112.5 kva for 4 seconds.

 (b)  
When the conditions above are met, the galley and utility buses supplied from the overloaded source are shed. The UBR(s) and galley ELCU(s) associated with the overloaded source de-energize. (The right main ac bus has two galley ELCUs. The left main ac bus has one.) The associated amber OFF light in the UTILITY BUS switch comes on, and the L (or R) UTIL BUS OFF message appears on the EICAS display. (This is a level C EICAS message.) The 90-kva level corresponds to about a "1.00" AC LOAD indication on the ELEC/HYD maintenance page of EICAS. The 112-kva level corresponds to about a "1.25" AC LOAD on EICAS. The BPCU initiates utility and galley bus shedding by removing grounds to the ELCUs and UBRs.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-23-00
 ALL  ú ú 05 Page 11 ú Jan 28/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (c)  
If one source is supplying both main ac buses at the time of the overload, both utility buses and all galley buses will be shed. If a separate source is supplying each main ac bus, only the utility and galley buses supplied by the overloaded source are affected by shedding. During normal two generator operation, source loading will not exceed 90 kva.

 (d)  
If one IDG is supplying power to both main ac buses, GCU protection circuits act to prevent loss of this remaining IDG due to a passive failure. (An example of a passive IDG failure is the presence of open diodes in the IDG rotor circuits.) Detection of a passive failure of the remaining IDG causes the corresponding bus tie breaker (BTB) to trip open. Therefore, all load transferred to the one operating IDG is dropped. The load is reduced to a value equal to or less than that carried before the failure of the other IDG. This prevents the combination of 1) a passive IDG failure, and 2) a high load, from depressing system voltage and tripping the remaining IDG off line.

 (e)  
Resetting a source overload shed is done by cycling the UTILITY BUS switch controlling the shed utility and galley buses. If the overload continues, the buses will again be shed after the source overload time delay.


 (7)  Single Source Operation
 (a)  
Load shedding occurs when single generator operation occurs inflight, or during the takeoff roll. The takeoff mode is sensed by the advanced position of both thrust levers. The takoff mode load shed is needed to assure adequate generator voltage for hydraulic pump starting. This is needed for braking in the event of a refused takeoff due to engine failure.

 (b)  
All galley and utility buses are immediately shed if: 1) One source (L IDG, R IDG, or APU) must supply electrical


 power to both main ac buses, and 2) the airplane is inflight, or 3) both thrust levers are advanced on the ground.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-23-00
 ALL  ú ú 04 Page 12 ú Jan 28/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 (c)  
When the conditions above are met, the BPCU de-energizes all UBRs and galley ELCUs. The galley and utility buses have no power. The amber OFF light in the UTILITY BUS switches come on, and the L and R UTIL BUS OFF messages appear on the EICAS display. (These are level C EICAS messages.) The BPCU does not allow the utility or galley buses to energize as long as the above conditions continue. (The BPCU initiates utility and galley bus shedding by removing grounds to the UBRs and ELCUs.)

 (d)  
If a second source (either IDG or APU generator) comes on line to supply main ac bus power, the utility and galley buses are automatically reset. This reset is accomplished by relay and interlock circuits external to the BPCU. With only one source operating, both bus tie breakers (BTBs) are closed. When the second source comes on line, at least one BTB opens, to prevent parallel source operation. This provides 28 volt dc to the UTILITY/GLY PWR FLT RESET relay. This one shot relay energizes the L and R UTIL BUS RESET relays for 1.5 seocnds. This relay action has the same effect as manually cycling the UTILITY BUS switches. Power to the utility and galley buses is restored.
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:757 AMM 飛機維護手冊 電源 ELECTRICAL POWER 1(94)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产伦精品一区二区三区视频黑人 | 天天综合狠狠精品| 欧美韩国日本精品一区二区三区| 91禁国产网站| 在线观看一区二区三区三州| 免费h精品视频在线播放| www.精品av.com| 日韩精品一区二区三区四区五区 | 国产精品国产亚洲伊人久久| 欧洲成人免费视频| 国产黑人绿帽在线第一区| 亚洲一区中文字幕| 成人欧美一区二区三区黑人| 欧美激情精品久久久久久黑人 | 久久国产亚洲精品无码| 婷婷久久青草热一区二区| 97免费视频观看| 亚洲综合av一区| 国产免费黄色一级片| 久久国产精品免费视频| 国产伦精品一区二区三区在线| 精品免费二区三区三区高中清不卡| 欧美成人第一区| 色妞在线综合亚洲欧美| 青青草原av在线播放| 国产成人无码av在线播放dvd| 青青草久久网络| www.亚洲成人| 免费观看国产成人| 一区二区三视频| 91久色国产| 日本一区二区三区免费观看| 视频一区视频二区国产精品| 欧美 国产 精品| 九九热精品在线| 成人免费视频a| 色综合久久88色综合天天提莫| 91免费在线视频| 婷婷五月综合缴情在线视频| 久久伊人一区二区| 日韩精品av一区二区三区| 日韩中文字幕国产| 欧美 国产 精品| 欧美精品久久一区二区| 91精品国产九九九久久久亚洲| 日韩av电影免费在线| www日韩中文字幕在线看| 国语精品中文字幕| 一区二区三区欧美成人| 国产精国产精品| 欧美性大战久久久久xxx| 国产精品极品美女粉嫩高清在线| 国产亚洲欧美一区二区三区| 一本久道久久综合| 久久国产色av免费观看| 精品视频一区二区三区四区| 亚洲一区二区久久久久久久| 日韩有码在线视频| 国产尤物av一区二区三区| 亚洲一区二区三区在线免费观看| www.日韩系列| 国产九区一区在线| 日产日韩在线亚洲欧美| 久久夜色精品国产亚洲aⅴ| 99精品人妻少妇一区二区| 日韩精品不卡| 中文字幕色一区二区| 久久国产精品免费一区| 欧美日韩国产精品激情在线播放| 伊人久久青草| 日韩视频欧美视频| 成人欧美一区二区| 欧美成ee人免费视频| 亚洲高清精品中出| 欧美成年人视频网站欧美| 久久免费福利视频| 国产深夜精品福利| 人人妻人人澡人人爽欧美一区| 九九精品视频在线| 日韩中文字幕精品视频| 97精品一区二区三区| 黄色成人在线免费观看| 亚洲精品蜜桃久久久久久| 国产精品久久国产| 久久久久久亚洲精品不卡4k岛国| 国产剧情久久久久久| 欧美精品色婷婷五月综合 | 国产一区视频在线| 青青草国产免费| 亚洲精品一区二区三区蜜桃久| 国产精品视频一区国模私拍| 国产成人精品免费视频大全最热| 国产精品一区二区你懂得| 男女视频一区二区三区| 日本久久亚洲电影| 午夜在线视频免费观看| 国产精品久久激情| 日韩中文字幕在线免费观看| 99国产盗摄| 国产美女被下药99| 激情网站五月天| 日韩欧美在线播放视频| 亚洲免费在线精品一区| 久久99久久亚洲国产| 国产精品第三页| 久久九九全国免费精品观看| 日韩中文字幕视频在线| 久久久久久久色| 国产高清在线一区二区| 北条麻妃在线视频观看| 国产欧美日韩网站| 欧美在线播放一区二区| 国产不卡一区二区视频| av 日韩 人妻 黑人 综合 无码| 久久人妻精品白浆国产| 无码人妻精品一区二区三区99v| 国产激情在线看| 日韩视频在线播放| 亚洲欧美日韩不卡| 欧美大码xxxx| 国产精品一区二区欧美黑人喷潮水 | 色噜噜国产精品视频一区二区| 久久精品ww人人做人人爽| 成人av资源网| 成人av在线网址| yellow视频在线观看一区二区 | 高清欧美精品xxxxx| 成人精品在线视频| 国产精品一区二区三区成人| 国产精品有限公司| 99久久99久久| 久久综合精品一区| 久久久久久尹人网香蕉| 久久久久久久久久久网站| www.欧美精品| 精品久久久久久乱码天堂| 91久久国产精品| 日韩激情久久| 在线免费一区| 国产精品二区在线| 国产成人精品电影| 91精品国产综合久久香蕉的用户体验| 欧美 日韩 国产 激情| 亚洲精品国产一区| 久久99热精品| 久久91亚洲精品中文字幕奶水| 久久精品成人欧美大片| 国产激情久久久久| av在线不卡一区| 国产成人无码a区在线观看视频 | 中文精品一区二区三区| 国产女女做受ⅹxx高潮| 亚洲欧洲免费无码| 国产成人午夜视频网址| 青青久久av北条麻妃黑人| 色女人综合av| 欧美久久久久久一卡四| 国产最新精品视频| αv一区二区三区| 久久久久久高清| 国产精品久久久久免费a∨ | 亚洲国产一区二区三区在线播| 日本一本中文字幕| 欧美日韩国产综合在线| 国产精品一二三视频| 国产成人精品久久二区二区| 久久综合色影院| 亚洲高清视频一区二区| 欧美一区视久久| 国产免费黄色小视频| 久久国产精品视频在线观看| 精品中文字幕视频| 日韩av在线播放不卡| 国产一区二区三区色淫影院| 久久久亚洲国产| 久久亚洲欧美日韩精品专区| 亚洲 自拍 另类小说综合图区| 欧美婷婷久久| 成人综合国产精品| 久久精品国产亚洲7777| 亚洲图片都市激情| 青草青草久热精品视频在线网站| 国产欧美日韩最新| 97免费中文视频在线观看| 国产精品入口免费视| 大波视频国产精品久久| 国产在线观看精品| 国产成人在线一区二区| 欧美激情亚洲精品| 欧美久久久久久一卡四| 久久综合一区二区三区| 国产精品福利在线观看网址| 日韩av免费在线| 国产精品亚洲不卡a| 国产精品无码乱伦| 日本一区二区在线播放| 成人毛片100部免费看| 国产精品久久二区| 欧美日韩国产不卡在线看| 国产精品96久久久久久又黄又硬|