国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 機務資料 >

時間:2011-03-30 10:30來源:藍天飛行翻譯 作者:航空
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

6)  Position flight controls hydraulic system B switch to ON. Make sure flight
controls system A switch is OFF. 7) Select system B on autopilot control panel. 8) Wait 10 seconds and then engage pitch axis on autopilot control panel. 9) Tilt vertical gyro approximately 20 degrees front end down and hold. 10) Measure and record right elevator trailing edge displacement with respect to
index mark.
545 
27-31-0 Page 536  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  Jun 20/92 


11)  Tilt the vertical gyro approximately 20 degrees front end up and hold.
12)  Measure and record right elevator trailing edge displacement with respect to index mark.
13)  Relevel the vertical gyro.
14)  Disengage the pitch axis.
15)  Add the displacements of steps 10) and 12). The total displacement shall be
3.51 士0.56 inches. 16) Turn on the hydraulic system A flight controls switch. 17) Repeat steps 8) thru 14) above. 18) The total displacement of steps 10) and 12) shall be 2.88 士0.46 inches. 19) Set stabilizer jackscrew B dimension at 42.28 士0.01 inches. 20) Reduce 3.50士0.05 psi (370士3 knots) pitot pressure to zero. Then increase
pressure to 2.80 士0.05 psi (334 士3 knots).
CAUTION:  DO NOT EXCEED 6 PSI (474 KNOTS) TO THE PITOTS AT ANY TIME DURING THIS TEST. OVERPRESSURE MAY DAMAGE FEEL COMPUTER.
21) Check that system B on the autopilot control panel is selected.
22) Repeat steps 8) thru 14) above.
23) The total displacement of steps 10) and 12) shall be 2.43 士0.39 inches.
24) Turn off the hydraulic system A flight controls switch.
25) Repeat steps 8) thru 14) above.
26) The total displacement of steps 10) and 12) shall be 3.07 士0.49 inches.
27) Reduce pitot pressure to zero.

545 
Jun 20/92  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  27-31-0 Page 537 


C. Restore Airplane to Normal
(1)
Ensure that all tools used during testing are removed.

(2)
Remove all masking tape.

(3)
Remove seals from drain holes in each vertical fin pitot tube.

CAUTION: MAKE SURE SEALS ARE REMOVED FROM PITOT TUBES.

(4)
Remove pressure gage lines from systems A and B drain lines located

(5)
Install drain plugs on system A and B drain lines located below feel computer.

(6)
Remove regulated air pressure lines from both vertical fin pitot tubes.

(7)
Open the vertical gyro circuit breaker and wait 10 minutes before remounting gyro.

(8)
Close all circuit breakers opened during testing.

(9)
Restore airplane to normal hydraulic configuration (Ref 27-31-0).

(10)
Remove electrical power if no longer required.


545 
27-31-0 Page 538  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  Feb 01/75 


ELEVATORS - REMOVAL/INSTALLATION
EFFECTIVITY
Airplanes with Aluminum/Fiberglass Elevators
1.  General
A.  For interchangeability of graphite/epoxy elevator with aluminum/fiberglass elevator, refer to 27-09-800.
B.  Balancing requirements are a function of elevator part number and elevator tab part number. Ensure that balancing requirements for elevator-elevator tab combination to be installed have been met per Chapter 51 of the Structural Repair Manual. Elevator rebalancing is required after structural repairs or after repainting.
C.  If an elevator control tab is being installed on the elevator during elevator installation, it is necessary to check that the number of elevator control tab adjust weights installed on the elevator nose corresponds with the required number of adjust weights marked on the elevator tab data plate (Ref 27-31-31 MP).
2.  Equipment and Materials
A.  Elevator Hoisting Adapter - F80026-1
B.  Hoist capable of lifting 200 pounds at a height of 20 feet
C.  Rigging Pins Kit - F70207-3, -52, -61, or -84:
REF NO.  F70207 - ( )  DIAMETER (INCHES)  LENGTH (INCHES)  FUNCTION 
E-5  -11  0.309-0.311  6.7 ±0.25  Aft Control Quadrant 

D.  Trammel Bar - F80055-1
E.  Corrosion Preventive Compound - MIL-C-11796, class 3 (Ref 20-30-21)
F.  Loading block - 17 inches long, 2 x 4 wood block
G.  Spring scale - 0- to 50-pound capability, graduated in 1-pound increments
H.  Milliohmmeter - 0- to 0.1-ohm range.
3.  Prepare for Removal
A.  Remove elevator systems A and B hydraulic power (Ref 27-31-0 MP).
B.  Remove or open the following access panels: Tail cone access panels 3801 and 3802, aft compartment access door 3701, stabilizer access panels 9105, 9107, 9108 and 9109 on left stabilizer or 9205, 9207, 9208 or 9209 on right stabilizer, elevator tab lock mechanism upper and lower access panels 9143 and 9142 on left elevator or 9243 and 9242 on right elevator (panels are located at elevator inboard leading edge, Fig. 401), tab pushrod access panel 9313 on left elevator or 9413 on right elevator, elevator hinge fitting upper and lower access panels 9128 thru 9141 on left elevator or 9228 thru 9241 on right elevator, and elevator control pushrod aft bolt access panel 3806 left or 3807 right (panel is located in tail cone adjacent to bolthead).
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:737 AMM 飛機維護手冊 飛行操縱 FLIGHT CONTROLS 2(76)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
青青在线免费观看| 日本一区二区三区四区在线观看| 国产日韩视频在线播放| 免费久久99精品国产自| 精品无码av无码免费专区| 欧美日韩一区综合| 欧美中日韩在线| 热久久免费视频精品| 欧美亚洲另类制服自拍| 三级三级久久三级久久18| 性欧美精品一区二区三区在线播放 | zzjj国产精品一区二区| 日韩一区二区欧美| 国产成人无码精品久久久性色 | 亚洲精品一区二区三区樱花| 午夜精品一区二区三区av| 日韩女在线观看| 欧美国产一区二区在线| 国产日韩精品在线播放| 国产精品8888| 国产精品日韩av| 亚洲欧美久久久久一区二区三区| 日本人妻伦在线中文字幕| 免费国产a级片| 91精品国产91| 国产精品久久久久久超碰| 亚洲影视中文字幕| 黄频视频在线观看| 久久久免费高清电视剧观看| 国产精品日本精品| 日本精品免费一区二区三区| 精品一区日韩成人| 97久久国产精品| 国产精品入口福利| 日韩在线第三页| 国产欧美日本在线| 久久手机免费视频| 日本一区二区久久精品| 国产精品亚洲精品| 国产精品黄视频| 欧美在线播放一区二区| 久久精品日产第一区二区三区精品版 | 国产精品美女网站| 日本福利视频网站| 99精品国产一区二区| 国产精品户外野外| 欧美伊久线香蕉线新在线| 97国产在线播放| 综合一区中文字幕| www国产精品内射老熟女| 国产精品成人一区二区三区吃奶| 欧美日韩国产综合视频在线| 久久综合久久色| 一区二区三区在线视频111| 国内精品400部情侣激情| 国产成人精品自拍| 男人添女人下部高潮视频在观看| 久久久久一本一区二区青青蜜月| 日本www在线视频| www.国产精品一二区| 欧美 国产 综合| 欧美精品激情在线观看| jizzjizz国产精品喷水| 午夜精品一区二区三区在线| 国产成人精品免费久久久久| 日韩女在线观看| 国产精品电影久久久久电影网| 免费黄色福利视频| 精品国产乱码久久久久久蜜柚| 国产伦精品一区二区三区四区免费 | 精品午夜一区二区| 中日韩在线视频| 久久国产亚洲精品无码| 免费在线国产精品| 欧美精品一区三区| 国产精品99免视看9| 奇米精品一区二区三区| 欧美精品性视频| 国产suv精品一区二区| 狠狠色噜噜狠狠狠狠色吗综合| 久久999免费视频| 久久精品在线免费视频 | 一区二区三区av| 久久久久久久久久久av| 国产一区 在线播放| 日本高清视频一区| 久久国产精品久久国产精品| 91国产视频在线播放| 欧美极品欧美精品欧美图片| 亚洲精品一卡二卡三卡四卡| 国产精品久久久久久中文字| 国产福利视频一区| 粉嫩av一区二区三区天美传媒| 欧美亚洲另类激情另类| 午夜精品久久久久久久久久久久久 | 久久久999免费视频| 成人免费无码av| 精品视频在线观看一区| 热久久精品免费视频| 日韩中文字幕在线视频观看| 亚洲欧美日韩不卡| 一区中文字幕在线观看| 久久精品福利视频| 久久久久久草| 91国在线精品国内播放| 国产精品一国产精品最新章节| 日本免费高清一区二区| 欧美激情精品久久久久久黑人 | 国产欧美亚洲视频| 欧美综合第一页| 日韩国产精品毛片| 色综合久久久久无码专区| 自拍另类欧美| 亚洲啪啪av| 亚洲人成77777| 亚洲欧美一区二区原创| 亚洲人成人77777线观看| 一区二区三视频| 亚洲一区免费看| 午夜美女久久久久爽久久| 天天久久人人| 天天综合中文字幕| 日本精品免费一区二区三区| 热久久99这里有精品| 精品日产一区2区三区黄免费 | 狠狠色综合欧美激情| 国产日韩在线视频| 国产美女精品在线观看| 久久久一本精品99久久精品| 久久精品视频一| 亚洲一区二区在| 国内精品国产三级国产在线专| 9a蜜桃久久久久久免费| 久久精品99久久久久久久久| 精品久久久久久久免费人妻| 亚洲综合色av| 精品一区日韩成人| 久久久国内精品| 亚洲资源视频| 欧美日韩精品中文字幕一区二区| 国产精品一区二区3区| 日韩有码在线观看| 性欧美亚洲xxxx乳在线观看 | 欧美另类一区| 91国产高清在线| 国产精品国产三级欧美二区| www..com日韩| 欧美xxxx18国产| 精品一区二区国产| 国产成人生活片| 日本黄网站色大片免费观看| 91精品国产一区二区三区动漫| 欧美激情网站在线观看| 日本午夜激情视频| 久久久免费看| 日韩国产一级片| 久久久久久九九九九| 日本香蕉视频在线观看| 国产福利精品在线| 欧美日韩爱爱视频| 国产精品一色哟哟| 欧美激情国产精品| 91免费国产视频| 国产精品青青在线观看爽香蕉| 亚洲尤物视频网| 国产精品av电影| 人人妻人人澡人人爽欧美一区双| 日韩中文字幕网址| 国语对白做受xxxxx在线中国| 国产精品成人一区二区三区吃奶| 国产日产欧美a一级在线| 欧美激情中文字幕乱码免费| www.欧美日本| 欧美亚洲日本在线观看| 国产精品网红福利| 国产精品永久在线| 日本成熟性欧美| 欧美成人在线免费| 久久久欧美一区二区| 加勒比在线一区二区三区观看| 精品丰满人妻无套内射| 国产成人精品视| 每日在线更新av| 天天综合狠狠精品| 国产精品福利小视频| 国产经典一区二区| 国内精品久久久久久久久| 午夜精品一区二区在线观看| 久久久久久久国产精品| 国内自拍欧美激情| 一区二区精品免费视频| 日韩在线激情视频| 国产精品在线看| 欧美福利一区二区三区| 亚洲人久久久| 欧美日韩aaaa| 国产精品美女视频网站| 久久久久久艹| 成人久久久久久久久| 欧美主播一区二区三区美女 久久精品人|