国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 > ICAO >

時間:2010-07-18 19:52來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

c) these operations require the use of elevation guidance below the primary runway minimum glide path.
13.7.5 Runway geometry
13.7.5.1 Figure G-33 shows permitted runway spacings and threshold staggers for the secondary runway. It represents
results for a 3 000 m (10 000 ft) primary runway. The geometrics change marginally with primary runway length. The shaded
area represents results obtained using existing MLS and DME/P (Standard 1) SARPs and the error budget identified in 13.2.
To use Figure G-33, enter the values for secondary runway spacing and threshold stagger. If the resulting point lies within the
shaded area a computed centre line approach to a 60 m (200 ft) DH on a 3-degree elevation is possible.
Note.— The circular region near the 1 200 m runway threshold stagger is due to the upper limit of elevation guidance
used. This region is not expected to present any practical operational limitations.
13.7.6 Extensions to the runway geometries
13.7.6.1 Flight and ground tests have shown that the shaded area can be expanded with the following additional
considerations:
a) an angular expansion is possible by utilizing existing elevation guidance outside the minimum specified azimuth
proportional guidance sector. Elevation guidance for this angular expansion must be verified; and
b) a radial expansion is possible with a slight relaxation of the vertical error budget to 4.9 m (16 ft). This relaxation is
still very conservative and equates to 66 per cent of the equivalent ILS error budget [7 m (24.1 ft)].
ATT G-41 23/11/06
Annex 10 — Aeronautical Communications Volume I
13.7.6.2 An example of the use of Figure G-33 is presented by point A. Using the foregoing expansions, a computed
centre line approach to a secondary runway is possible for a –1 400 m runway spacing and +200 m threshold stagger.
14. Application of Table G-15 service level objectives for MLS/RNAV operations
14.1 MLS/RNAV procedures discussed below can be conducted with ground equipment meeting integrity and
continuity of service objectives identified in Table G-15. Many of these operations may be accomplished with MLS ground
equipment meeting Level 2 objectives only. Further a majority of the procedures may not require positive guidance during
the discontinued approach/missed approach procedure. Where procedural means cannot provide the required obstacle
clearance along an unguided discontinued approach/missed approach, some form of secondary guidance will be required. The
accuracy requirements of the secondary guidance system will be determined by the nature of the obstacle-rich environment.
14.1.1 In those rare cases where an MLS/RNAV procedure is in an obstacle-rich environment, the calculated obstacle
exposure time (OET) may require a higher level of equipment type than that required for landing.
14.1.2 Determination of critical segments
14.1.2.1 The following terms are used to determine the length of the critical segments of an MLS/RNAV procedure.
Obstacle-rich environment. An environment where it is not possible to construct an unguided discontinued
approach/missed approach using procedural means. Secondary guidance will be required to achieve a climb to
minimum sector altitude.
Critical segment. A segment where an unguided discontinued approach/missed approach would expose the aircraft to an
obstacle.
Obstacle exposure time (OET). The time interval required to fly the critical segment of an MLS/RNAV procedure. This
time is used to establish the required level of service of the non-aircraft guidance equipment.
14.1.2.2 In order to determine OET the following procedure can be followed (see Figure G-34):
a) determine if there is an obstacle-rich environment by aligning the unguided discontinued approach/missed approach
surface with any potential heading that may be used during an unguided discontinued approach/missed approach
from the MLS/RNAV procedure;
b) determine whether there is a procedural means for avoiding the obstacle without the need for secondary guidance;
and
c) determine the OET as the period of time during which the obstacle is within the unguided discontinued approach/
missed approach surface, while there is no procedural means for avoiding the obstacle.
14.2 Computed centre line operations
14.2.1 When conducted to the primary runway, these operations require the airborne system to compute lateral
guidance only. Vertical guidance is provided by the elevation function directly. The airborne equipment providing the lateral
guidance must have the same integrity as the MLS receiver is required to have for basic MLS operations being conducted to
an equivalent decision height. Computed centre line operations conducted to a decision height below a Category I decision
height require that the DME have an accuracy, integrity and continuity of service level applicable to the type of operation.
 
中國航空網 m.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:附件10--航空電信an10_v1_6ed下(145)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
日韩精品久久久| 青青草视频国产| 日韩成人在线资源| www.av蜜桃| 精品丰满人妻无套内射| 欧美 日韩 国产一区| 久久久欧美精品| 亚洲熟妇无码一区二区三区| 国产日本欧美在线观看| 欧美伦理91i| 国产一区二区在线观看免费播放 | 亚洲一区二区三区免费看| 国产日韩中文字幕在线| 久久久久久久久久久人体| 日韩中文字幕在线视频观看| 91国产在线播放| 亚洲乱码日产精品bd在线观看| 国产精品亚发布| 中文字幕日韩精品久久| 国产免费高清一区| 美女黄色丝袜一区| 国产欧亚日韩视频| 精品国产综合| 国产美女精品在线观看| 蜜月aⅴ免费一区二区三区 | 久久精品视频免费播放| 青青草一区二区| 国产成人生活片| 欧美 日韩 国产 高清| 国产精品丝袜高跟| 国产综合在线观看视频| 久久国产精品首页| yy111111少妇影院日韩夜片| 亚洲精品在线视频观看| 国产妇女馒头高清泬20p多| 日本欧美精品久久久| 久久久久免费精品国产| 欧美日韩天天操| 国产精品国产对白熟妇| 国产精品一二三视频| 萌白酱国产一区二区| 国产美女搞久久| 亚洲二区自拍| 日韩视频精品在线| 男女午夜激情视频| 国产精品国产三级国产专播精品人 | 超碰网在线观看| 精品国产福利| 国产精品av网站| 欧美亚洲第一区| 欧美巨猛xxxx猛交黑人97人| 国产精品96久久久久久| 欧美精品一区在线| 久久伊人精品天天| www黄色日本| 日韩av一级大片| 久久久国产成人精品| 国产精品小说在线| 日本a级片在线观看| 国产精品对白一区二区三区| 91九色视频在线观看| 精品人伦一区二区三区| 亚洲欧洲日本国产| 国产精品无码人妻一区二区在线 | 国产精品久久久久久亚洲影视 | 国产激情视频一区| 欧美日韩在线不卡一区| 美日韩精品免费观看视频| 久久综合婷婷综合| 精品视频一区二区在线| 亚洲a成v人在线观看| 国产精品视频网| 91免费视频国产| 国语精品中文字幕| 日韩资源av在线| 欧美激情精品久久久久| 久久久久中文字幕| 国产精品午夜国产小视频| 人妻av无码专区| 亚洲欧洲久久| 欧美精品在线看| 日韩视频免费中文字幕| 国产欧美日韩网站| 久久精品国产96久久久香蕉| 国产伦精品一区二区三区视频免费 | 日韩在线第一区| 婷婷久久青草热一区二区| 国产精品视频26uuu| 91久久精品视频| 激情一区二区三区| 日本一区二区高清视频| 中文字幕一区二区三区四区五区 | 午夜精品www| 久久99久久亚洲国产| 国产精品区二区三区日本| 久久国产欧美精品| 91久久在线视频| 国产一区二区在线免费视频| 日韩女优中文字幕| 亚洲97在线观看| 一女被多男玩喷潮视频| 精品久久久久亚洲| 国产精品久久久久不卡| xxx一区二区| 九色91在线视频| 久久久亚洲精选| 成人免费网视频| 国产欧美123| 国产又爽又黄的激情精品视频| 欧美亚洲另类在线| 日本高清视频一区| 日本久久久精品视频| 日本中文字幕一级片| 亚洲在线视频福利| 伊人久久在线观看| 最新不卡av| 一区二区不卡视频| 亚洲一区三区在线观看| 亚洲字幕一区二区| 一区二区不卡在线观看 | 黄色网址在线免费看| 日av中文字幕| 日韩国产一级片| 人妻有码中文字幕| 日韩欧美在线电影| 日韩欧美精品久久| 欧美专区中文字幕| 黄色大片在线免费看| 狠狠干一区二区| 国产一区在线观| 国产伦精品一区二区三区照片91| 国产免费一区视频观看免费| 风间由美一区二区三区| 成人羞羞国产免费网站| 91久久精品在线| 久久99精品久久久久久久青青日本 | 99久久免费观看| 91av免费看| 久操网在线观看| 国产精品私拍pans大尺度在线| 国产精品人成电影| 久久国产精品免费视频| 亚洲综合在线小说| 色大师av一区二区三区| 日本免费在线精品| 日本10禁啪啪无遮挡免费一区二区| 欧美在线观看日本一区| 国内精品一区二区三区| 国产免费xxx| 99久久自偷自偷国产精品不卡| 91精品国产综合久久香蕉922| www亚洲国产| 久久久久亚洲精品| 欧美理论片在线观看| 在线一区高清| 日本一区视频在线观看免费| 日韩免费黄色av| 国内精品久久久久久| 分分操这里只有精品| 国产成人精品免费视频大全最热 | 国产精品久久久久久久av电影| 精品免费久久久久久久| 在线天堂一区av电影| 天堂va久久久噜噜噜久久va| 欧美一区二三区| 国产欧美久久久久久| 国产成人a亚洲精品| 国产精品第一页在线| 亚洲一区二区三区四区视频| 日韩有码免费视频| 国内免费精品永久在线视频| 操人视频欧美| 久久精品99久久香蕉国产色戒| 精品国产三级a∨在线| 午夜精品久久久久久久99热浪潮| 欧美视频第三页| 不卡一区二区三区视频| 久久久久久亚洲| 国产精品久久久久高潮| 亚洲欧洲中文| 精品网站在线看| 久久伦理网站| 国产精品久久亚洲7777| 亚洲精品日韩av| 国产综合色一区二区三区| 久久av免费一区| 欧美日韩国产二区| 欧美性资源免费| 国产精品99久久久久久白浆小说 | 日韩高清av| 国产伦精品一区二区三区视频黑人 | 国产中文一区二区| 国产v综合ⅴ日韩v欧美大片 | 免费h精品视频在线播放| www.日日操| 国产精品视频网站| 日本高清视频精品| 99精彩视频| 国产精品无av码在线观看| 午夜精品久久久久久久白皮肤|